Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
550,000,000 JPY
Elementary school Municipal Kamimeguro elementary school 320m
Junior high school Municipal Meguro Chuo junior high school 980m
Supermarket My Basket Yutenji Station West shop 380m
Park Tagiri Park 330m
Hospital Dr. Kubo's office 200m
Other facilities 1 Seven-Eleven Meguro Yutenji Station west exit store 380m
Other facilities 2 トモズエトモ Yutenji store 440m
Other facilities 3 Tokyu Store Chain Yutenji store 510m
Unused after renovation All rooms cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced I put a floor and change it Boiler replaced Door replaced Water Pipes replaced
Outward appearance construction (I put a meter box painting ・ entrance wind group tile lighting equipment replaced et al.) (November, 2023) plan Elevator replaced (November, 2023) plan It is planned to accommodate and install flooring ・ cross swap, kitchen ・ bath and toilet ・ washstand replaced, housing part replaced (November, 2023)
■ Access ━━━━━━━━━━━━━━━ ... ・ ・
○ Good location of a 5-minute walk from Tokyu Toyoko Line "Yutenji" Station
○ I can take advantage of a 14-minute walk from Tokyu Toyoko Line "Nakameguro" Station, too
■ Recommended ━━━━━━━━━━━━━━━ ... ・ ・
○ It is located on the hill of the quiet Category 1 Low-Rise Exclusive Residential District
○ Steel reinforced concrete house of the Constructed by Taisei Corporation
○ Extensive garden to overlook from the second-floor LD
○ Panoramic view (depends on the weather) to see the Mount Fuji ・ Tokyo Tower ・ Skytree from the roof
○ Three parking space 有 (as for indoor two, with an electric shutter)
○ 5LDK which is available as a duplex house
○ Kitchen two existence
○ With Dresser of 2 bowls
○ I place a walk-in closet in the each room
○ With sauna healing fatigue in a day
○ Home elevator replaced plan
○ Delivery to home box 有
■ Reform contents (going to be completed in the end of November, 2023) ━━━━━━━━━━━━━━━ ... ・ ・
○ Elevator replaced
○ Flooring change
○ Wallpaper changed
○ Kitchen replaced
○ Bathroom replaced
○ Sauna setting
○ Dresser replaced
○ Restroom replaced
○ Housing part replaced
○ Accommodate and install
○ Washing Bakery ・ washing faucet replaced
○ Outward appearance construction, etc.
(I put shutter woodgraining die knock sheet change, meter box painting ・ entrance wall surface tile lighting equipment replaced et al.)
Read More Read Less