Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
66,990,000 JPY
Elementary school Kanoi, Tateishi, Nerima-ku East elementary school 480m
Junior high school Nerima City Minamigaoka Junior High School 1,030m
Park Cherry tree open field Green Space 670m
Hospital Nerima Hospital attached to the Juntendo University medical department 1,010m
Other facilities 1 7-Eleven 3, Minamitanaka, Nerima store 380m
Other facilities 2 FamilyMart Fujimidai, Nerima store 560m
Other facilities 3 Tsuruha drug Minamitanaka, Nerima store 380m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Door replaced
Interior (each room cross, floor, wall, housing part, house cleaning) (January, 2025) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom) (January, 2025) plan
■Traffic Access ━━━━━━━━━━━━━━━ ... ・ ・
○ A 11-minute walk from Seibu Ikebukuro Line "Nerima-Takanodai" Station
○ A 11-minute walk from Seibu Ikebukuro Line "Fujimidai" Station
○ A 19-minute walk from Seibu Shinjuku Line "Shimoigusa" Station
■Recommended ━━━━━━━━━━━━━━━ ... ・ ・
○ 80.68 square meters of plottage (about 24.40 tsubo)
○ 84.73 square meters of Total floor area (about 25.63 tsubo)
○ January, 2025 interior reform construction Complete finished
○ It faces the east side width about 4.0m public road
○ Southeast Orientation Terrace
○ A certain about 17.5 quires of space LDK
○ All rooms with flooring specifications
○ There is all rooms storing
○ System kitchen with dishwasher ・ water purifier
○ Bathroom with additional heating ・ bathroom dryer
○ There is a window suitable for the ventilation in a bathroom
○ I install Washlet restroom in the 1.2 floor
○ The delivery box which is convenient in absence
○ There is parking space (※ Depending on car type)
■Interior reform contents (it has been completed in January, 2025) ━━━━━━━━━━━━━━ ... ・ ・
○ System kitchen ・ bathroom replaced
○ Restroom ・ washstand replaced
○ Wallpaper changed ・ flooring swap
○ Floor tile change ・ housing part replaced
○ Lighting equipment replaced
○ House cleaning
■ ━━━━━ ... which helps with search for house you like
The detailed ・ Ask of the Properties, please feel free to contact us.
Read More Read Less