Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
17,980,000 JPY
Elementary school Thorn units elementary school 950m
Junior high school Shinoro West junior high school 1,000m
Supermarket Robin store 900m
Park Nishibarato Sakura Park 250m
Hospital Yokoyama physician's office 900m
Other facilities 1 Seicomart Shinoro Article 7 shop 1,020m
Other facilities 2 Thorn units post office 1,310m
Other facilities 3 Police gong Shinoro store 1,520m
Unused after renovation All rooms cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced I put a floor and change it Boiler replaced Door replaced
Roof (I reroof the bookstore painting, a penthouse), all rooms wallpaper changed, flooring swap, tatami facing spare cushion floor swap (December, 2022) Kitchen replaced, bathroom replaced, restroom replaced, Dresser replaced, Boiler replaced, mixed faucet replaced (December, 2022) for the washing machine Shoebox replaced, 間取変更, the entrance door replaced, switchboard replaced, lighting equipment replaced, register replaced, housing part replaced (December, 2022)
■ Overview ━━━━━━━━━━━━━━━ ... ・ ・
○ 1, Nishibarato-5-jo HOUSE
○ 1985 12 月築
○ Land area: 205.07 square meters (about 62.03 tsubo)
○ Total floor area: 92.75 square meters (about 28.05 tsubo)
○ The Northwest side public road width: About 6.0m Abutting road: About 29.8m
○ 4SLDK of LDK about 12.0 quires
○ There is all rooms storing
○ There is a storeroom
○ Japanese-style room
○ The sun is good for a site of the wound Narikawa side
○ There is it for two parking space
○ There is storing under the stairs
○ There is a snow melting tank
■ Reform contents (December, 2022 completion) ━━━━━━━━━━━━━━━ ... ・ ・
○ Roof (I reroof the bookstore painting, a penthouse)
○ All rooms wallpaper changed
○ Flooring swap
○ 畳表替
○ Cushion floor swap
○ Kitchen replaced
○ Bathroom replaced
○ Restroom replaced
○ Dresser replaced
○ Boiler replaced
○ Mixed faucet replaced for the washing machine
○ Shoebox replaced
○ 間取変更
○ The entrance door replaced
○ Switchboard replaced
○ Lighting equipment replaced
○ Register replaced
○ Housing part replaced
○ Switch ・ outlet replaced
○ Closet new establishment
○ Some windowpanes replaced
○ House cleaning
Read More Read Less