Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
36,900,000 JPY
Elementary school Hill Elementary School of ノホロ 1,070m
Junior high school Kaminopporo Junior High School 600m
Supermarket Duties supermarket Kaminopporo store 720m
Park Kaminopporo ノホロ park 320m
Hospital いたや 内科消化器科 660m
Other facilities 1 Tsuruha drug Kaminopporo store 760m
Other facilities 2 Seicomart Hiraoka Park shop 820m
Other facilities 3 Atsubetsu Kaminopporo post office 880m
Unused after renovation All rooms cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced I put a floor and change it
I change spare base board replaced, Japanese-style room with window top plate for a change, a plastic strike sash to a Western-style room and I am completed and am dressed richly (March, 2023) Kitchen replaced, IH cooker replaced, bathroom replaced, Dresser replaced, restroom replaced, air conditioner appliance replaced (March, 2023) Housing part replaced, wallpaper changed, flooring change, the entrance doorcase replaced, CF change, lighting equipment replaced, outlet switch replaced (March, 2023)
■ Overview ━━━━━━━━━━━━━━━ ... ・ ・
○ 2, Kaminopporo-3-jo HOUSE
○ March, 2000 の Light-gauge Steel 2 stories old
○ 236.61 square meters of Land area (about 71.57 tsubo)
○ 54.16 square meters of Total floor area the first floor 86.14 square meters/the second floor
140.30 square meters (about 42.44 tsubo) in total
○ Northeast side public road width about 8.0m, about 12.0m Abutting road
○ 4LDK of LDK about 27.5 quires
○ Island kitchen counter
○ IH cooking heater
○ Each floor restroom 有
○ There are about 8.1 quires of master bedroom, WIC
○ 全居室収納有
■ Reform contents (March, 2023 Complete) ━━━━━━━━━━━━━━━ ... ・ ・
○ Kitchen replaced
○ IH cooker replaced
○ Bathroom replaced
○ Each floor restroom replaced
○ Air conditioner appliance replaced (living room ロスナイ, each room pipe fan)
○ Housing part, frame, 下駄箱入替
○ Wallpaper changed
○ Floor flooring change
○ The entrance doorcase replaced
○ Cushion floor change (UT, restroom)
○ Lighting equipment new establishment (downlight new establishment, rail Right new establishment)
○ 各所 outlet switch replaced
○ Window top plate replaced
○ Base board replaced
○ The first-floor Japanese-style room is changed to a Western-style room
○ House cleaning
Read More Read Less