Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
22,800,000 JPY
Elementary school Middle marsh West small school district 2,240m
Junior high school Okadama Junior High School 2,320m
Supermarket With mart Okadama shop 1,430m
Park Middle marsh Park 250m
Hospital Dr. Akehi Okadama's office 1,510m
Other facilities 1 Seicomart North Okadama shop 940m
Other facilities 2 FamilyMart Kitaokadama-2-jo, Sapporo store 1,020m
Other facilities 3 Sapporo sprouts; a re postal station 1,440m
Unused after renovation All rooms cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced I put a floor and change it Boiler replaced Door replaced Water Pipes replaced
System kitchen replaced, restroom replaced, bathroom bathroom replaced, Dresser replaced (April, 2023) All outer wall ・ roof washing and stretching, housing part replaced, window replaced, entrance door replaced, heating ・ hot water supply Facilities and Water Pipes replaced (April, 2023) Replace insulation material replaced, some pillars, wallpaper changed, flooring washing and stretching, cushion floor change (April, 2023)
■ 1, Nakanumanishi-4-jo HOUSE ━━━━━━━━━━━ ... ・ ・
○ 103.68 square meters of Total floor area (about 31.36 tsubo)
71.28 square meters of the first floor
32.40 square meters of the second floor
○ 198.54 square meters of Land area (about 60.05 tsubo)
○ 2 stories
○ Front road width about 5.3m
○ Abutting road about 13.5m
○ Forming place
○ Island kitchen counter
○ IH cooking heater
○ All rooms with flooring
○ There is all rooms storing
■ April, 2023 reform completion ━━━━━ ... ・ ・
[building]
○ Outer wall washing and stretching
○ Roof washing and stretching
○ I replace an insulation material
○ I replace a some buildings pillar
[Facilities]
○ Wallpaper changed
○ Flooring washing and stretching
○ Cushion floor change
○ Housing part replaced
○ Window replaced
○ System kitchen replaced
○ Dresser replaced
○ Bathroom bathroom replaced
○ The entrance door replaced
○ Restroom replaced
○ Heating ・ hot water supply Facilities and Water Pipes replaced
○ Wall board replaced
○ Lighting equipment setting
Read More Read Less