Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
49,800,000 JPY
Elementary school Hilly section South elementary school 610m
Junior high school Kotoni Junior High School 700m
Supermarket ラルズマート hilly section store 250m
Park Hilly section poplar park 330m
Hospital Course clinic in Mizushima 80m
Other facilities 1 Seicomart Yamanote-1-jo store 180m
Other facilities 2 Tsuruha drug hilly section store 170m
Other facilities 3 Sapporo hilly section post office 350m
The second-floor hot water supply boiler replaced (March, 2010) I construct a Plan change ・ bathroom replaced ・ Dresser replaced ・ restroom replaced ・ road heating construction ・ wall made of blocks (March, 2002) Outer wall siding construction (November, 2003)
■ Overview ━━━━━━━━━━━━━━━ ... ・ ・
○ Former Matsumoto Kenko Co., Ltd. construction, house of the two-by-four method
○ It is a 16-minute walk to Sapporo Municipal Subway Tozai Line "Kotoni" Station
○ For a Northwest ・ Southwest corner lot, the sun is good
○ Duplex house
Two garages including the first floor of 5LDK group, carport two (by the car model)
○ 91.40 square meters of the first floor (about 27.64 tsubo) (include a garage part including a group)
101.87 square meters of the second floor (about 30.81 tsubo)
101.02 square meters of the third floor (about 30.55 tsubo)
○ Island kitchen counter system kitchen (the third-floor part)
○ City gas eco-jaws
○ There is all rooms storing
○ There are a kitchen and a bathroom on the third floor on the second floor
○ There is a restroom on the third floor on the second floor
○ There is the study (the first-floor part)
○ 24 hours ventilation system
○ There is a sun parlor
○ Road heating laying
■ Reform history
○ Plan change (March, 2002)
○ The second-floor the third-floor bathroom ・ washstand ・ restroom replaced (March, 2002)
○ Road heating construction (March, 2002)
○ Wall made of blocks construction (March, 2002)
○ Outer wall siding construction (November, 2003)
○ The second-floor hot water supply boiler replaced (March, 2010)
○ Heating boiler replaced (October, 2012)
○ The second-floor the third-floor kitchen ・ room Plan change (November, 2012)
○ Part of Western-style room cross washing and stretching (December, 2012)
○ Kerosene tank replaced (October, 2013)
○ Interlocking grip enlargement (October, 2013)
○ Roof heater setting (November, 2017)
Read More Read Less