Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
24,900,000 JPY
Elementary school Shiraoka West elementary school 630m
Junior high school Shiraoka Junior High School 620m
Supermarket Duties are super 280m
Park Original ヶ well park 320m
Other facilities 1 Well Shea 690m
Other facilities 2 Food off stocker 320m
Other facilities 3 Lawson 930m
Unused after renovation All rooms cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Boiler replaced
Intercom replaced with television monitor, Japanese-style room sliding paper-door ・ shoji change, ceiling wall cross replaced, base board replaced, entrance frame ・ door replaced (April, 2023) plan Bathroom replaced (bathroom ventilation with clothes drying function), kitchen replaced (dishwasher), washstand replaced, restroom replaced, CF replaced (April, 2023) plan, Base board replaced, Boiler replaced, the outer wall ・ roof painting, ceiling construction, the house laundry and others (April, 2023) plan
■ Recommended ━━━━━━━━━━━━━━━ ... ・ ・
○ April, 2023 reform Complete planned 4LDK
○ Nearby facilities) duties supermarket about 280m, food off stocker 320m, Well Shea 690m)
○ Front road width about 5.0m
○ Southern aspect Terrace
○ The back of the hut storing
○ There is all rooms storing
○ Walk-in closet
○ There is parking space (there are car model restrictions)
○ Bathroom ventilation with clothes drying function
○ 食器洗乾燥機
○ Intercom with the television monitor
○ It is a restroom in 1 ・ 2F
■ Reform enforcement (going to be completed in April, 2023) ━━━━━━━━━━━━━━━ ... ・ ・
○ Bathroom replaced (bathroom ventilation with clothes drying function)
○ Kitchen replaced (dishwasher)
○ Washstand replaced
○ Restroom replaced
○ CF replaced
○ Intercom replaced with television monitor
○ Japanese-style room sliding paper-door ・ shoji change
○ Ceiling wall cross replaced
○ Base board replaced
○ Entrance frame ・ door replaced
○ Boiler replaced
○ Outer wall ・ roof washing, the painting
○ Ceiling construction
○ The house laundry and others
Read More Read Less