Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
30,500,000 JPY
Elementary school Okurayama Elementary School 1,260m
Junior high school Forest Junior High School of the shrine 570m
Park West Maruyama good friend Park 170m
Hospital Sapporo tomorrow Kei Hospital 1,120m
Other facilities 1 Mt. canola flower drugstore ASAHI shop 1,170m
Other facilities 2 Seicomart はまざき shop 1,120m
Other facilities 3 Maruyamanishimachi postal agency 670m
Unused after renovation All rooms cross/wall papering substitute Bathroom replaced Restroom replaced Dresser replaced Boiler replaced
The painting (June, 2023) plan of the outer wall ・ roof Get the wall ・ ceiling wallpaper changed of all rooms, hot water supply heating boiler replaced, bathroom replaced, restroom replaced, Dresser replaced (December, 2022)
■ ━━━━━━━━━━━━━━━ ... ・ ・ recommended here
○ 4LDK of the November, 2000 architecture
○ There is it for two parking space (but it depends on a car model)
○ Exposure to the sun is good in Facing South living
○ It becomes the house environment that is quiet whether the Properties outskirts are full of green.
■ Characteristics ━━━━━━━━━━━━━━━ ... ・ ・ of the Properties
○ House of the name of a post home old construction
○ Terrace is installed in a bay window, the Western-style room south side in 1st living.
○ There is a storeroom on a garden, the site Northwest side in the building south side.
○ Island kitchen counter (IH cooking heater specifications)
○ Intercom with television monitor
○ The heat source of the hot water supply ・ heating becomes kerosene.
■ Reform contents
(it has been completed in December, 2022)
○ I get the wall ・ ceiling wallpaper changed of all rooms
○ Hot water supply heating boiler replaced
○ Bathroom replaced
○ Restroom replaced
○ Dresser replaced
○ I get the floor cushion floor change of the utility ・ restroom
○ Vent replaced
○ Switch replaced
○ House cleaning
(going to be completed in the middle of June, 2023)
○ The painting of the outer wall ・ roof
Read More Read Less