Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
59,800,000 JPY
Elementary school Ota City Rokugo Elementary School 280m
Junior high school Ota City Rokugo Junior High School 300m
Supermarket OK Nakarokugo store 350m
Park 3, Nakarokugo second park 240m
Hospital It is a clinic in this white 350m
Other facilities 1 7-Eleven 3, Higashirokugo, Ota-ku store 180m
Other facilities 2 FamilyMart 3, Nishirokugo store 550m
Other facilities 3 3, Nishirokugo, Ota post office 650m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (February, 2026) plan Interior (each room cross, floor, wall, housing part) (February, 2026) plan
■ Access ━━━━━━━━━━━━━━━━━ ...
○ An 8-minute walk from Keikyu Main Line "Zoshiki" station
○ An 8-minute walk from Keikyu Main Line "Rokugodote" station
■ Recommended ━━━━━━━━━━━━━ ...
○ February, 2026 reform Complete plan
○ Exposure to the sun is good in Southeast Orientation
○ It is convenient for shopping to OK Nakarokugo store in about 5-minute walk (about 350m)
○ Child care environment is good to the municipal Rokugo elementary school in a 4-minute walk (about 280m)
○ I open the sliding door, and on earth the use is possible with about 11.5 quires of LDs, too
○ Island kitchen counter (with a dishwasher) to be able to enjoy a conversation while cooking
○ With bathroom dryer which is reliable on the rainy day
○ The Layout that it was secured storage space on an each room closet
○ Intercom with TV monitor which is reliable in a visitor
○ With automoatic lock keeping a comfortable living
○ The delivery box which baggage can get even in absence
■ Reform contents (going to be completed in February, 2026) ━━ ...
○ System kitchen replaced
○ Bathroom replaced
○ Dresser replaced
○ Restroom replaced
○ Wall, ceiling wallpaper changed
○ Each room floor tile swap
○ Each room flooring swap
○ Housing part replaced
○ Boiler replaced
○ Lighting equipment replaced
○ Washing Bakery replaced
○ House cleaning
Read More Read Less