Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
29,900,000 JPY
Elementary school The Hachioji City tenth elementary school 560m
Junior high school Hachioji City brown-eared bulbul Manabu Yamanaka school 960m
Supermarket AEON food-style Hachioji store 920m
Park Former Yokoyama Park 510m
Hospital Migita Hospital 20m
Other facilities 1 Drug Store SEIMS Owada, Hachioji store 940m
Other facilities 2 7-Eleven 7, Owada, Hachioji store 250m
Other facilities 3 Hachioji post office 280m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Door replaced Water Pipes replaced
Interior (each room cross, floor, housing part, sash) (April, 2025) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom, water supply and drainage pipe) (April, 2025) plan, House cleaning (April, 2025) plan
■ Recommended ━━━━━━━ ... ・ ・
○ The beginning of April, 2025 reform Complete finished
○ 3LDK of 75.56 square meters of exclusive area
○ About 16.4 quires of LDK with a space
○ The island kitchen counter which living and dining room can look around
○ Living and dining room with the study counter keeping an eye on a child
○ Refa Fine Bubble shower head adoption
■ Traffic ━━━━━━━ ... ・ ・
○ A 19-minute walk from JR Chuo Line ・ Yokohama Line ・ Hachiko Line "Hachioji" Station
○ A 17-minute walk from Keio Line "Keiohachioji" Station
■ The beginning of April, 2025 reform Complete plan ━━━━━━━ ... ・ ・
○ System kitchen (with a dishwasher) replaced
○ Bathroom (bathroom dryer) replaced
○ Dresser (with the triple mirror) replaced
○ Restroom (belonging to warm water washing) replaced
○ Housing part ・ shoe cupboard replaced
○ Air-conditioner New setting
○ Interior lattice ・ desk counter New construction (LDK)
○ Flooring ・ floor tile New finish
○ Indirect lighting ・ spotlight New construction (LDK)
○ Right controller setting (LDK)
○ Water supply and drainage pipe update
○ Cross each room change ・ washing Bakery replaced
○ House cleaning
Read More Read Less