Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
20,800,000 JPY
Elementary school Shiki City Shiki fourth elementary school 290m
Junior high school Shiki City Shiki second junior high school 630m
Supermarket アコレ Niiza store 900m
Park Hall neighborhood park 230m
Hospital Smartweed internal medicine clinic 800m
Other facilities 1 Yanasegawa Station 960m
Other facilities 2 Lawson Shiki New Town shop 620m
Other facilities 3 Shiki hall post office 480m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Boiler replaced
Interior (each room cross) (November, 2022) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (November, 2022) plan
■ Large housing complex - Shiki New Town ... which represents Shiki
○ 4LDK of 93.33 square meters of exclusive area
○ I arrive to the fifth-floor partial Top Floor Southeast, and exposure to the sun is good
○ The impression that the room is well acquainted with because of the Plan of four southern aspects
○ The view from Terrace in spring cherry blossoms and the fresh green,
You can enjoy colored leaves and a seasonal change in autumn
○ Original developer ・ design construction of KAJIMA CORPORATION
○ The large housing complex which spreads from ekimae
○ The house environment that is blessed with green and water
○ Many location of an open space and the amusement place
○ Pets allowed (there is detailed regulations)
■ Reform contents
(November, 2022 construction)
○ J ・ sliding paper-door swap
○ Part of housing part replaced
○ Each room cross washing and stretching
○ The ceiling painting
○ Intercom New setting working under TV monitor
(March, 2023 construction)
○ Bathroom newly installed (with a bathroom heating ventilation dryer, the Reheating function)
○ Boiler newly installed (eco-jaws)
○ Restroom newly installed (with the Washlet function)
○ Dresser newly installed
○ Washing face room wall ・ floor change
○ Restroom wall ・ floor change
(September, 2023 construction)
○ System kitchen newly installed
Read More Read Less