Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
44,800,000 JPY
Elementary school Itabashi City Akatsukashinmachi Elementary School 240m
Junior high school Itabashi City Akatsuka third Junior High School 1,670m
Supermarket COMO D Iida Akatsukashinmachi store 200m
Park Hikarigaoka Park 80m
Hospital Association of nonprofit foundation community medicine promotion Hikarigaoka, Nerima Hospital 1,180m
Other facilities 1 FamilyMart 3, Akatsukashinmachi, Itabashi store 290m
Other facilities 2 Drag PAPASU Akatsukashinmachi store 240m
Other facilities 3 Tree of lily mall 390m
Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom) (May, 2010) plan
■ Tree of Hikarigaoka Park town lily street North Building No. 2
○ 3 Station 4 accessible lines possibilities
・A 10-minute walk from Tokyo Metro Yurakucho Line ・ Fukutoshin Line "Chikatetsu-Akatsuka" Station
・A 13-minute walk from Tobu Tojo Line "Shimoakatsuka" Station
・A 21-minute walk from Toei Oedo Line "Hikarigaoka" Station
○ Nature is next to Hikarigaoka Park which is full of overflow green
・Metropolitan park of the Tokyo available number that I can feel seasonal nature including the ginkgo in spring in cherry blossoms, the autumn
○ It is about 390m to the tree of lily mall
○ There are much convenience facilities at the mall
○ The summer festival of the mall sponsorship is held, too
■ Overview ・ Recommended
○ 85.02 square meters of the third-floor partial 3LDK
* The entrance aside storing power-rich storeroom and expenses
* Terrace ventilation ・ lighting is good in two west ・ east sides
* The island kitchen counter which bounds of the conversation
* Storing-rich fastening firmly cupboard
* Built-in dishwasher
* LD part floor heating
■ Reform construction enforcement history (May, 2010 Complete)
○ Kitchen replaced (I include a cupboard)
○ Bathroom replaced (belonging to Reheating function ・ bathroom ventilation with clothes drying function)
○ Washing face room replaced (with three mirror storing ・ showers)
○ Restroom replaced (belonging to a tankless restroom ・ independence bathroom)
■ Large-scale repair construction enforcement history
○ Service pipe ・ drainage pipe update construction (2019)
※I change the bathroom ・ restroom to update construction
○ Sash newly installed (2023)
Indoor condition is good and can come to just live.
Because of a Vacant dwelling unit, please observe the ・ feeling free to contact us.
Read More Read Less