Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
29,980,000 JPY
Elementary school Kajigaya Elementary School 220m
Junior high school Miyazaki Junior High School 740m
Park Maginu overpass lower park 610m
Hospital Course fire extinguisher clinic in Kirihara 520m
Other facilities 1 Lawson Kawasaki Kajigaya 5 chome shop 310m
Other facilities 2 Drug Store SEIMS Kawasaki Kajigaya shop 630m
Other facilities 3 Kaji ヶ valley post office 470m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced
Interior (each room cross, floor, housing part) (June, 2025) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (June, 2025) plan
■ Access ━━━━━━━━━━━━━━━ ... ・ ・
○ A 16-minute walk from Tokyu Denentoshi Line "Kajigaya" Station
■ Recommended ━━━━━━━━━━━━ ... ・ ・
○ Large-scale repair construction enforcement finished (January, 2021)
○ 3LDK of 56.70 square meters of exclusive area
○ I arrive to 4 stories the second-floor partial ・ Southwest, and exposure to the sun is good
○ LDK of about 12.0 quires of area
○ The island kitchen counter which communication increases to
○ The washing of the rainy day is with a reliable ventilation drying heating machine, too
○ There is storing in each room
○ There are a convenience store and a supermarket near, and the purchase is convenient, too
○ An elementary and junior high school, a park are within walking distance, and child care environment is good
■ Reform history ━━━━━━━━━━━━ ... ・ ・
(June, 2025 enforcement)
○ Boiler (additional heating function) replaced
○ Kitchen replaced
○ Bathroom replaced
○ Washing face replaced
○ Restroom replaced
○ Place equipped with a water supply floor change
○ All wallpaper changed
○ Flooring change
○ Accent wallpaper changed
○ Housing part replaced
○ Lighting replaced
○ Dropping replaced containing
○ House cleaning
Read More Read Less