Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
58,980,000 JPY
Elementary school Mugwort next elementary school 490m
Junior high school Inokoishi Junior High School 450m
Supermarket Aoki Super Chiyogaoka store 820m
Park Inokoishi Park 310m
Other facilities 1 Tsutsujigaoka, Nagoya post office 260m
Other facilities 2 V ・ drug Tsutsujigaoka store 420m
All rooms cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Door replaced
Exterior (outer wall, roof, inspection ・ ant-proof construction enforcement finished) (February, 2023) plan Interior (all rooms cross, housing part, Japanese-style room J, sliding paper-door new making, shoji change, switch ・ コン) (February, 2023) plan, Place equipped with a water supply (cue) (February, 2023) plan ecological from kitchen, bathroom, restroom, washroom, all electrification construction (gas Boiler
■ Recommended ━━━━━━━━━━━━━━━ ... ・ ・
○ Layout: 5LDK
○ Order for Sekisui House house
○ Frontage about 11m
○ There is a walk-in closet
○ There is roof balcony
○ There is it for three parking space (Depending on car type)
○ All electrification
■ Reform contents (February, 2023 enforcement) ━━━━━━━━━━━━━━━ ... ・ ・
○ Kitchen replaced, bathroom replaced, washstand replaced,
○ Restroom replaced (・ the second floor on the first floor), washing Bakery replaced, washing faucet replaced
○ All electrification construction (I change it for EcoCute from gas Boiler)
○ All rooms (cross swap ・ floor tile facing ・ screen door swap)
○ Japanese-style room J, sliding paper-door new making, shoji change, switch ・ outlet replaced
○ LDK ・ corridor ・ washroom ・ restroom ・ walk-in closet downlight installation
○ The entrance tile swap, shoe cupboard new establishment, housing part Toride replaced, stairs handrail new making, the entrance door new making
○ Function gatepost, delivery box installation
○ Roof, construction of the exterior painting, inspection ・ ant-proof construction enforcement finished
Read More Read Less