Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
46,800,000 JPY
Elementary school Meirin Elementary School 430m
Junior high school Sakuragaoka Junior High School 740m
Supermarket MaxValu Tokugawa Meirin store 30m
Park Shindeki Park 330m
Hospital Dr. Kondo's office 330m
Other facilities 1 Well Shea Tokugawa Meirin store 60m
Other facilities 2 Shindeki, Nagoya post office 210m
Other facilities 3 FamilyMart Nagoya Univ. of Tokyo Sone shop 220m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Boiler replaced Door replaced Water Pipes replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom, water supply and drainage pipe, Boiler, bathroom heating dryer) (February, 2022) plan Interior (each room cross, housing part, all window point sash roller replaced, house cleaning, window) (September, 2024) plan, Exterior (outer wall, roof, large-scale repair drainage pipe update construction) (June, 2024) plan
■ Access ━━━━━━━━━━━━━━━ ... ・ ・
○ A 7-minute walk from JR Chuo Main Line "Ozone" Station
○ A 11-minute walk from Subway Meijo Line ・ Meitetsu Seto Line "Ozone" Station
○ 3 accessible lines is possible
■ Recommended ━━━━━━━━━━━━━━━ ... ・ ・
○ 3LDK of exclusive area about 125 square meters
○ The ・ ventilation ・ view per positive is good for a room of the 20th floor Southeast Corner Unit
○ The living and dining room is about 21.7 quires of spaciousness
○ Expenses, storage space richness including the shoe closet
○ Condominium of the Hotel-like inner corridor design
○ The plane Parking lot succession belonging to roof is possible
○ It is condominium with high security performance of the manned management for 24 hours
○ The room is an errand very carefully
■ Reform contents ━━━━━━━━━━━━━━━ ... ・ ・
≪2010 >> bathroom replaced, Dresser replaced
≪December, 2014 >> kitchen replaced, cross each room replaced, door ・ closet ・ housing part replaced
≪2019 >> electricity water heater replaced
≪2021 >> restroom replaced
Place equipped with a water supply side pull pipe update
I put a window 99% ultraviolet rays cut film (other than North bedroom)
Screen door swap
≪February, 2022 >> bathroom heating dryer replaced
≪All September, 2024 >> window point sash roller replaced, house cleaning
○ The repair drainage pipe update construction completion large-scale in 2022
○ The repair construction completion large-scale in March, 2025
Read More Read Less