Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
14,800,000 JPY
Elementary school Sapporo City Minamiko, Kiyota school 760m
Junior high school Sapporo City Kiyota Junior High School 790m
Park Kiyota Chuo Park 600m
Hospital Suzuki physician's office 610m
Other facilities 1 Satudora Kiyota Article 2 shop 290m
Other facilities 2 FamilyMart Sapporo International University prev shop 380m
Other facilities 3 Lawson Sapporo Kiyota Article 3 shop 410m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Door replaced
Interior (each room cross, floor, wall, housing part, the entrance storing, lighting equipment, waterproofing bread) (October, 2024) plan I change Plan of it to a Western-style room from a Japanese-style room (October, 2024) and plan it, Place equipped with a water supply (kitchen, bathroom, restroom, washroom) (October, 2024) plan
■Overview
○Subway Toho Line "Fukuzumi" Station bus ride 14 minutes
HOKKAIDO CHUO BUS "Kiyota Article 3 2" 停徒歩 four minutes
○Reinforced Concrete 11 stories the first floor part
○72.80 square meters of exclusive area (about 22.02 tsubo)
○Terrace 13.12 square meters in area (about 3.96 tsubo)
○3LDK
○1994 (Heisei 6) September
○Southwest Orientation Terrace
○Gas: Intensive propane
○Hot water supply/heating: Gas boiler (TES)
○There is storage room to a Terrace part
○I finish air-conditioner setting to a living part (product made in 2024)
○There is storing in all rooms (two WIC of them)
○For island kitchen counter, I can look around the living room
■Reform contents (it has been finished in the beginning of October, 2024)
○System kitchen newly installed
○Bathroom newly installed
○Dresser newly installed
○Restroom newly installed
○Washing machine waterproofing Bakery New setting
○Flooring change
○Wall ・ ceiling wallpaper changed
○CF change
○The entrance storing newly installed
○Lighting equipment newly installed
○Housing part newly installed
○It is Plan change etc. in a Western-style room from a Japanese-style room
Read More Read Less