Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
29,980,000 JPY
Elementary school Sapporo City Makomanai Park Elementary School 430m
Junior high school Sapporo City Makomanai beginning junior high school 600m
Supermarket Fresh mart ASKA 400m
Park Makomanaihoncho Park 40m
Hospital Makomanai outpatient department plaza 700m
Other facilities 1 Subway Namboku Line "Makomanai" station 2,100m
Other facilities 2 Satudora Makomanaimidorimachi store 1,130m
Other facilities 3 Seicomart 7, Makomanaihoncho store 210m
Each room cross/wall papering substitute Restroom replaced Dresser replaced Boiler replaced
Exterior (part of outer wall repair) (January, 2026) plan Place equipped with a water supply (restroom, washroom, Boiler, kitchen carane replaced, UB carane replaced, IH) (December, 2025) plan, Interior (each room cross, CF swap, J swap, boiler replaced, Ren Ziv) (December, 2025) plan
■Overview
* Subway Namboku Line "Makomanai" station bus ride 13 minutes
It is a 3-minute walk to Jotetsu bus "Akebonocho" 停
* 156.67 square meters of Land area (about 47.39 tsubo)
* 188.84 square meters of total floor area (about 57.12 tsubo)
* Wood galvanizing steel thatching the roof with shingles 3 stories
* 4SLDK
* The site where about 8.7m contacts with the public road of north side 8.0m
* 2001 (Heisei 13) September
* Home plan Center old construction
* Parking two possibility (there are Depending on car type restrictions) in the site
○Garage with electric shutter
* On the second floor, the third floor restroom available (warm water washing toilet seat with)
* It is storing available in all rooms
○Japanese-style room available
○IH cooking heater adoption
■Reform contents
(December, 2025 Complete)
* Restroom replaced (the first floor, the second floor)
○Dresser replaced
* Wallpaper changed (each room)
* Cushion floor swap (restroom, UT)
○J swap
○Kitchen carane replaced
○IH replaced
○UB carane replaced
○Heating boiler replaced
○Range hood replaced
○Intercom replaced
○Register replaced
○Pipe fan replaced
○Curtain rail removal
○Screen door replaced
(going to be completed in January, 2026)
○Part of outer wall repair
Read More Read Less