Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
85,990,000 JPY
Elementary school Nerima City Nerima Elementary School 330m
Junior high school Nerima City Nerima Junior High School 630m
Supermarket Summit store Nerimakasugacho store 90m
Park Nerima City hello park 430m
Hospital Ando clinic 170m
Other facilities 1 Lawson 3, Kasugacho, Nerima 50m
Other facilities 2 Matsumotokiyoshi Nerimakasugacho store 220m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced
Interior (each room cross, floor, wall, housing part, floor tile swap etc.) (March, 2025) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler, waterproofing Bakery ・ washing faucet replaced) (March, 2025) plan
■ Traffic Access ━━━━━━━━━━━━━━━ ... ・ ・
○ A 1-minute walk from Toei Oedo Line "Nerimakasugacho" Station
○ A 17-minute walk from Toei Oedo Line "Hikarigaoka" Station
■ Recommended ━━━━━━━━━━━━━━━ ... ・ ・
○ Nerima-Kasugacho Station direct connection
○ Mitsui Fudosan Co.,Ltd. ・ Nippon Steel Corporation original developer condominium
○ The condominium lower floor part has the store which is convenient for life a lot
○ Compound model Landmark Tower condominium
○ An exposure to the sun ・ view is good because of Southeast Corner Unit
○ 69.60 square meters of exclusive area
○ Terrace 19.59 square meters in area
○ 19 stories the 16th-floor partial ・ 3LDK belonging to the second floor under the ground
○ Management (night security) manned for 24 hours
○ Hotel-like inner corridor design
○ The delivery box that a receipt of the baggage is convenient in the absence
○ System kitchen with dishwasher
○ The bathroom dryer which is comfortable on the rainy day
■ Interior reform construction contents (March, 2025 Complete) ━━━━━━━━━━━━━━━ ... ・ ・
○ System kitchen replaced
○ Bathroom replaced with bathroom dryer
○ Dresser replaced
○ Washing faucet replaced
○ Waterproofing Bakery replaced
○ Warm water washing function restroom replaced belonging to
○ Flooring swap
○ Housing part replaced
○ The entrance storing replaced
○ Storing shelf replaced
○ Cross swap
○ Floor tile swap
○ One air-conditioner
○ Lighting equipment setting
○ Switch ・ outlet replaced
○ House cleaning etc.
Read More Read Less