Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
53,800,000 JPY
Elementary school Municipal Meiji elementary school 960m
Junior high school Municipal Fukagawa second junior high school 1,170m
Park Sagacho Park 190m
Hospital Uozumi synthesis clinic 520m
Other facilities 1 SUGI drugstore 1, Shinkawa store 700m
Other facilities 2 7-Eleven Koto Saga 1 chome shop 120m
Other facilities 3 cocokara fine Monzennakacho store 870m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced
Interior (intercom etc. working under each room cross, floor, wall, housing part, monitor) (June, 2025) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler, washing waterproofing bread replaced etc.) (June, 2025) plan
■ Access ━━━━━━━━━━━━━━━ ... ・ ・
○A 10-minute walk from Tokyo Metro east and west ・ Toei Oedo Line "Monzennakacho" Station
○A 9-minute walk from Tokyo Metro Hanzomon Line "Suitengu" Station
○A 16-minute walk from Tokyo Metro Hibiya ・ Tozai Line "Kayabacho" Station
■ Recommended ━━━━━━━━━━━━ ... ・ ・
○Southeast Orientation corner unit
○36.16 square meters of 1LDK
○The end of June, 2025 renovation Complete plan
○Plural accessible lines is possible
○Automoatic lock condominium belonging to
■ Reform contents (going to be completed in the end of June, 2025) ━━ ... ・ ・
○ System kitchen replaced
○ Clean water one faucet replaced
○ Three mouth cooker replaced
○ Dresser replaced
○ Washing waterproofing Bakery replaced
○ Washing faucet replaced
○ Bathroom replaced
○ Bathroom dryer replaced
○ Restroom replaced
○ Boiler replaced (there is additional heating)
○ Exclusive possession department water supply hot water supply drainage pipe replaced
○ Cross entire surface swap
○ Floor entire surface swap
○ Internal housing part replaced
○ Intercom replaced etc. working under monitor
Read More Read Less