Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
86,800,000 JPY
Elementary school KitaCity Oji elementary school 160m
Junior high school KitaCity Oji cherry blossoms junior high school 160m
Park Nanushinotaki Park 370m
Hospital Oji, Kita-ku clinic 330m
Other facilities 1 Matsumotokiyoshi Oji shop 740m
Other facilities 2 Lawson 2, Oji store 330m
Other facilities 3 3, Oji post office 260m
Restroom replaced Floor replaced
Interior (floor, wall) (October, 2025) plan Exterior (waterproofing construction) (October, 2025) plan J change of the Japanese-style room, floor change (October, 2025) plan of bathroom, Place equipped with a water supply (restroom) (October, 2025) plan
-Recommended of the Properties
▼Location
・A 9-minute walk from Tokyo Metro Namboku Line "Oji" station
・A 11-minute walk from JR Keihin-Tohoku Line "Oji" station
・As 2 accessible lines is possible, it is convenient for commuting, attending school
▼Characteristics
・Steel 3-story bldg.
・Layout: 4LDK
・Total floor area: About 128.07 square meters
・Land area: About 87.27 square meters (I include private road burden about 5.62 square meters in area)
・It is rectangular lot of the Abutting road in the Northwest side about 4.0m public road
・With the built-in garage (car model restrictions available)
・It is established the cellar by a garage part
・It is set up storage space by a Western-style room or a corridor
▼Facilities
・With bathroom ventilation with clothes drying function
・A function is with additional heating
・Intercom with the monitor
▼There is a reform history
(October, 2025 enforcement)
・Wall, ceiling wallpaper changed
・Floor change
・Dresser enlargement (2nd floor part)
・Restroom replaced (with the warm water washing)
・J change of the Japanese-style room
・Floor change of bathroom
・The housing part painting
・The roof waterproofing repair work
・Terrace waterproofing construction
(November, 2025 enforcement)
・Water Pipes update
We help you find a property that meets your needs
For property details or inquiries, please feel free to contact us.
Read More Read Less