Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
54,800,000 JPY
Elementary school Shinagawa City Ushiroji elementary school 820m
Junior high school Shinagawa City Ebara Daiichi Junior High School 260m
Supermarket My Basket 6, Nishigotanda store 230m
Park Kyoto positive park 730m
Hospital Echo clinic 280m
Other facilities 1 Lawson Three F Ebara 1 chome shop 430m
Other facilities 2 6, Nishigotanda, Shinagawa post office 390m
Other facilities 3 エトモ Musashikoyama 1,100m
Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler, washing waterproofing bread) (May, 2026) plan Interior (floor, wall, housing part, house cleaning) (May, 2026) plan
-Recommended - of the Properties
▼Location
・Tokyu Meguryo Line "Fudomae" 9-minute walk
・Tokyu Meguryo Line "Musashikoyama" 13-minute walk
・Tokyu Ikegami Line "Togoshi-Ginza" 12-minute walk
▼Characteristics of the room
・The sunshine is good for the third-floor part, Southwest Orientation
・43.20 square meters of exclusive area, 1SLDK type
・The island kitchen counter which can look around a room
・Walk-in closet with the storing power
▼Characteristics of the condominium
・The location that 3 station 2 accessible lines is possible
・Automoatic lock with the monitor
・The delivery box which can get baggage even in absence
▼Reform contents (it has been finished in May, 2026)
・System kitchen replaced (three shares of cookers)
・Bathroom replaced (with additional heating, a bathroom dryer)
・Dresser replaced
・Restroom replaced (belonging to a toilet bowl with warm water flush system for washing user)
・Boiler replaced (with additional heating, multi-remote control)
・Washing waterproofing Bakery replaced
・Floor tile change (the entrance)
・Housing part complete set replaced
・Flooring facing (removable alcove finish)
・Wallpaper changed
・House cleaning
■ We help you find a property that meets your needs
For property details or inquiries, please feel free to contact us.
Read More Read Less