Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
49,800,000 JPY
Elementary school Higashioda Elementary School 450m
Junior high school Tajima Junior High School 1,300m
Park Oda 7 chome park 50m
Other facilities 1 7-Eleven Kawasaki Oda 7 chome shop 50m
■ Access ━━━━━━━━━━━━━━━ ... ・ ・
○ Than JR Nambu Line "Sakae Oda" Station a 9-minute walk
○ Than JR Tokaido ・ Keihin Tohoku ・ Nambu Line "Kawasaki" Station
Bus 18 minutes "NX Corporation prev" 1 min walk
■ Recommended ━━━━━━━━━━━━━━━ ... ・ ・
○ 3LDK dwelling unit of exclusive area 90.06 square meters
○ Arrive to Southwest; good exposure to the sun (there is no dwelling unit in the upper floor)
* About 19.0 quires of extensive LDK
* With the porch of the Detached House sense (about 4.87 square meters)
○ Island kitchen counter to be able to enjoy a conversation while cooking
○ System kitchen of with water purifier ・ dishwasher
○ It is recommended to a family having a small child to be able to look around a living room
○ We do not have to worry about the washing with bathroom dryer on the rainy day
○ Abundant storage space such as walk-in closets
○ As there is delivery box, a receipt of the baggage is possible of absence
○ Condominium (there is detailed regulations) which can live with an important pet
○ Automoatic lock with the TV monitor who is reliable in a visitor
■ Reform contents (March, 2025 Complete) ━━━━━━━━━━━━━━━ ... ・ ・
○ Each room housing part ・ shoe cupboard newly installed
○ Each room soundproofing flooring New construction
○ Tree base board newly installed
○ Floor tile New construction (the entrance earthen floor ・ washing face room ・ restroom room)
○ L-form system kitchen newly installed (with 1650 X 2650 size, a water purifier ・ dishwasher)
* Dresser newly installed (1500 wide) with the Thor storing
○ Restroom newly installed
* Bathroom newly installed (1418 size)
○ Boiler newly installed
○ Cross each room swap (some accents cross construction)
○ Downlight newly installed ・ enlargement
○ Lighting equipment newly installed
○ Waterproofing Bakery ・ washing faucet replaced
○ Lace curtain New installation
○ House cleaning
Read More Read Less