Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
18,800,000 JPY
Elementary school Osaka Municipal growth elementary school 120m
Junior high school Osaka Municipal Gamo Junior High School 150m
Supermarket Life Sekime store 250m
Other facilities 1 Noe Station (Keihan Main Line) 190m
Other facilities 2 JR Noe Station (JR Osaka Higashi Line) 400m
Other facilities 3 UNIQLO Sekime, Joto store 400m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced
Interior (each room cross, floor, wall, housing part, Plan change ・ entrance storing ・ AC precedent Water Pipes ・ lighting) (December, 2024) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler, faucet for the washing bread ・ washing machine) (December, 2024) plan
■ Recommended ━━━━━━━━━━━━━━━ ... ・ ・ of the Noe century condominium
○1LDK of 53.10 square meters of exclusive area
* Storing-rich room
* There is shoes box
* Exposure to the sun is good in a room of the Facing South♪
* Island kitchen counter
* Night Automoatic lock
* A 3-minute walk from Keihan Electric Railway main line "Noe" Station!
* Surrounding environment enhancement! Various life convenience facilities are within walking distance♪
■ December, 2024 reform completion finished♪
━━━━━━━━━━━━━━━・・...
[new making ・ new establishment]
Bathroom (with a bathroom heating dryer)
System kitchen (with a dishwasher)
Restroom (belonging to a toilet bowl with warm water flush system for washing user)
Dresser (belonging to a shower faucet)
Boiler
Washing bread
Faucet for the washing machine
All housing parts
The entrance storing
AC precedent Water Pipes
Switchboard
Switch
Monitor phone
[change]
Flooring
Cushion floor
Wall ・ ceiling entire surface cross
[Other]
Plan change
Lighting installation
Cleaning
Read More Read Less