Our Site uses cookies to improve your experience on our website. For more details, please read our Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
199,800,000 JPY
Elementary school Kojimachi Elementary School 470m
Junior high school Kojimachi Junior High School 1,150m
Supermarket Maruetsu petit Ichibanchō shop 140m
Park General Togo Memorial Park 350m
Other facilities 1 FamilyMart Ichibanchō shop 270m
Unused after renovation All rooms cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced I put a floor and change it
Kitchen ・ bathroom ・ washstand ・ restroom replaced, cross ・ flooring change plan (August, 2022)
... Four Seasons Grande Ichibancho ...
The Residence which stands still on the Ichibancho, Chiyoda-ku hill, and enjoys life with high formality
The beginning of August, 2022, reform completion plan
■ Recommended points ━━━━━━━━━━━━━━━ ... ・ ・
○ 2001 5 月築
○ All dwelling unit storage room attachment (for free)
○ Pets allowed (there are breeding detailed rules)
○ Corridor design in the hotel-like
○ Taking out garbage is possible for 24 hours
○ There is a Parking lot space (the point of April, 2022 Confirm)
■ Traffic ━━━━━━━━━━━━━━━ ... ・ ・
○ A 3-minute walk from Tokyo Metro Hanzomon Line "Hanzomon" Station
○ A 6-minute walk from Tokyo Metro Yurakucho Line "Kojimachi" Station
○ Tokyo Metro Namboku Line ・ Yurakucho Line, a 7-minute walk from Toei Shinjuku Line "Ichigaya" Station
○ A 10-minute walk from JR Chuo Line ・ Sobu Line "Ichigaya" Station
■ Characteristics ━━━━━━━━━━━━━━━ ... ・ ・ of the dwelling unit
* The 14th floor of the Top Floor
○ 2LDK, 84.86 square meters
○ East-West North corner unit (good the ventilation ・ sunshine by 3 direction dwelling units)
○ Bathroom with the window
○ With bathroom ventilation with clothes drying function
○ It is with a window in the kitchen
○ I can enjoy a view from each room ・ Terrace.
○ The new establishment including the kitchen ・ bathroom ・ washing face room ・ restroom, a floor ・ wallpaper changed plan. It is going to be completed in around the beginning of August, 2022
Show comment I close Comment