Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
32,800,000 JPY
Elementary school Takarazuka City Mefu elementary school 500m
Junior high school Takarazuka City Takarazuka junior high school 1,700m
Supermarket Coop めふ 160m
Park 4, Mefu park 300m
Hospital Coarse internal medicine 90m
Other facilities 1 7-Eleven Mefuhigashinocho, Takarazuka store 130m
Other facilities 2 Mefu, Takarazuka post office 220m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced
Interior (each room cross, floor) (October, 2024) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom) (October, 2024) plan
■ Recommended ━━━━━━━━━━━━━━━ ... ・ ・
○ The middle of October, 2024 reform completion
○ The location that is available for use of 2 line 3 Station
・A 2-minute walk from Hankyu Takarazuka Line "Mefujinja" Station
・An 18-minute walk from Fukuchiyama Line "Nakayamadera" Station
・A 12-minute walk from Hankyu Takarazuka Line "Nakayama Kannon" Station
○ It is the geographical features that are FLAT to Station
○ Exposure to the sun is good for two Terrace of the Southeast ・ Northwest
○ It is a certain about 16 quires of space LDK
○ Because the each room has an opening, the ventilation is good
○ There is it about six quires of each room or more
○ Elevator stop floor
○ Location with high convenience that each life facility keeps within the range of a 10-minute walk (about 800m)
■ Reform contents ━━━━━━━━━━━━━━━ ... ・ ・
○ Layout change (Japanese-style room → Western-style room)
○ System kitchen new making ○ bathroom new making
○ Dresser new making ○ restroom new making ○ washing Bakery new making
○ Electric water heater new making ○ switchboard replaced ○ screen door swap
○ Each room cross swap ○ each room flooring swap
○ CF swap ・ software base board replaced (washing face room ・ restroom)
○ House cleaning
Read More Read Less