Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
480,000,000 JPY
●Designer building along Suwa-dori St.
●I adopt the buffering floor where a burden does not depend on a leg and joint with all floors either
●There is an openable mirror wall in 1st and the 2nd floor in studding/2nd floor of about 2.8m
●The bathtub of the bathroom of/4th floor which there is a high-performance security camera system in adopts a jet bus in 3rd floor
●4th floor powder room wall surface carat tile/4th floor washstand is TOTO high-end model adoption
[repair history]
January, 2023 outer wall repair
September, 2022 1F air-conditioner repair
May, 2022 outer wall crack repair
Each October, 2021 floor air-conditioner cleaning
It is constructed each floor LED in October, 2020
January, 2019 hot water supply machine new establishment (eco-jaws)
Security camera replaced high-performance in February, 2018
June, 2017 4F Dresser replaced (TOTO)
December, 2016 exterior painting super cera; tight F (all)
Inner wall (partly)
August, 2016 3 ・ 4F air-conditioner exchange
July, 2016 2 ・ 4F renovation
Read More Read Less