Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
209,900,000 JPY
Elementary school The third Shinagawa Ward Hino Elementary School 620m
Junior high school Shinagawa Ward Hino school 1,900m
Supermarket Two Seijo Ishii atre Meguro 270m
Park IKEDAYAMA park 770m
Hospital めぐろ 駅東口 men Tal clinic 110m
Other facilities 1 Seven-Eleven Meguro CENTRAL SQUARE shop 250m
Other facilities 2 Well Shea Kamiosaki, Meguro store 190m
Other facilities 3 atre Meguro 1 270m
All rooms cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced
Interior (all rooms cross, floor, wall, housing part, downlight setting, house cleaning) (March, 2024) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler, washing bread, tile change) (March, 2024) plan
■ Access ━━━━━━━━━━ ... ・ ・
○ A 3-minute walk from Yamanote Line ・ Tokyu Meguryo Line ・ Tokyo Metro Namboku Line ・ Toei Mita Line "Meguro" Station
■ Recommended ━━━━━━━━━━━━━━━ ... ・ ・
○ Good location of a 3-minute walk from 4 accessible lines possible "Meguro" Station
○ 3LDK type of Exclusive area 92.39 square meters
○ Independent Layout design to go in and out of an each room corridor
○ Spacious LDK of about 18.3 tatami that the ventilation is good by two lighting
○ The floor heating available that the living and dining room warms the room from the step
○ The island kitchen counter which can look around the living room
○ About 7.0 quires of bright Western-style rooms facing the Southeast Orientation Terrace
○ The walk-in closet available which I can store the clothing which is important in about 8.6 quires of Western-style rooms in
○ Automoatic lock working under TV monitor who is convenient in a visitor
○ Pets allowed (rules apply)
○ The delivery to home box available which can get baggage of absence
○ The grand entrance hall where the floor put granite, and the wall adopted marble
■ Reform contents (March, 2024 Complete) ━━━━━━━━━━━━━━━ ... ・ ・
○ Dresser replaced
○ Kitchen replaced
○ Bathroom replaced
○ Restroom replaced
○ Tile (washing face room ・ restroom) change
○ Washing Bakery replaced
○ Hot water supply machine replaced
○ Flooring (in all rooms) replaced
○ Cross entire surface change
○ Housing part replaced
○ Downlight setting
○ The house laundry and others
Read More Read Less