Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
84,990,000 JPY
Elementary school Tateda, Meguro-ku way Elementary School 570m
Junior high school Meguro Ward Arabian bird junior high school 1,400m
Park Meguro garbage and sewage plant buffer green zone 330m
Hospital Association of government official cooperative association society Tokyo mutual aid hospital 1,100m
Other facilities 1 Seven-Eleven Ebisu United States bridge store 350m
Other facilities 2 Qol drugstore Ebisu store 330m
Other facilities 3 Meguro Mita post office 370m
Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Boiler replaced Door replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (June, 2024) plan Interior (housing part, the entrance storing, lighting equipment ・ downlight) (June, 2024) plan
■ Access ━━━━━━━━━━ ... ・ ・
○ A 10-minute walk from JR Yamanote Line ・ JR Saikyo Line ・ JR Shonan-Shinjuku Line "Ebisu" Station
○ A 11-minute walk from Ebisu station / Tokyo Metro Hibiya Line
○ A 13-minute walk from JR Yamanote Line ・ Tokyu Meguryo Line ・ Toei Mita Line ・ Tokyo Metro Namboku Line "Meguro" Station
■ Recommended ━━━━━━━━━━━━━━━ ... ・ ・
○ Big community of 204 Total Units
○ The location that 2 Station 7 accessible lines is possible
○ I am faced with Southeast Orientation Terrace, and exposure to the sun is good
○ 66.30 square meters of Exclusive area, 3LDK type
○ The island kitchen counter which enjoys the conversation with the family
○ System kitchen with the tableware washing dryer ・ water purifier
○Extensive bathroom of 1317 size
○ With bathroom ventilation with clothes drying function which is washable on the rainy day
○ With walk-in closet with the storing power
○ Each room storing available
■ Reform contents (going to be completed in the middle of June, 2024) ━━━━━━━━━━━━━━━ ... ・ ・
○ Wallpaper changed
○ Flooring change
○ Floor tile change
○ Housing part ・ entrance storing replaced
○ System kitchen replaced (with a tableware washing dryer ・ water purifier)
○ Dresser replaced
○ Bathroom replaced
○ Boiler replaced
○ Restroom replaced
* Lighting equipment ・ downlight installation
* House cleaning
Read More Read Less