Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
218,000,000 JPY
Elementary school Wards Riccho Tando Elementary School 200m
Junior high school Municipal Hachiyama junior high school 1,000m
Supermarket Peacock store Ebisu store 350m
Park Ebisu Park 180m
Hospital Tokyo mutual aid hospital 1,100m
Other facilities 1 FamilyMart Ebisu Shrine prev shop 70m
Other facilities 2 cocokara fine Ebisu store 100m
Other facilities 3 Ebisu ekimae post office 220m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced
Interior (each room cross, floor) (May, 2026) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (May, 2026) plan, Three air-conditioners, lighting equipment replaced (May, 2026) plan
Qualia Ebisu waste toe
■ Access ━━━━━━━━━━ ...
○ A 1-minute walk from Ebisu station / Tokyo Metro Hibiya Line
○ A 2-minute walk from JR Yamanote Line, JR Saikyo Line, JR Shonan-Shinjuku Line "Ebisu" station
○ A 10-minute walk from Tokyu Toyoko Line "Daikanyama" station
■ Recommended
○ 3 station accessible lines possibilities and Access are good
○ It is a view, gets plenty of sunlight because of top floor, corner unit
○ Dwelling unit belonging to Sky terrace overlooking Tokyo Tower
○ It is convenient for supermarket convenience store Walk less than ten minutes and life
○ System kitchen with dishwasher
○ Bathroom with bathroom dryer which is convenient for the washing of the rainy day
○ Automoatic lock of the relief
○ The delivery box which is convenient for baggage receiving in the absence
○ Pets allowed (there is detailed regulations)
■ Reform contents (May, 2026 Complete)
○ Kitchen bath and toilet replaced
○ Dresser replaced
○ Wall, ceiling cross flooring change
○ Housing part, the entrance storing shelf replaced
○ Boiler pipe replaced
○ Air-conditioner three replaced
○ Lighting equipment replaced
Read More Read Less