Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
67,990,000 JPY
Elementary school Setagaya City Todoroki elementary school 660m
Junior high school Setagaya City East Fukazawa Junior High School 680m
Park Mishima Park 280m
Hospital Okazaki internal medicine clinic 180m
Other facilities 1 Sugi drug Fukazawa shop 320m
Other facilities 2 Setagaya Fukazawa post office 490m
Other facilities 3 Lawson Nippon Sport Science Univ. prev shop 60m
Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced
Interior (floor, wall, housing part) (October, 2025) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (October, 2025) plan
■Access
○An 18-minute walk from Tokyu Denentoshi Line "Sakurashimmachi" station
○A 22-minute walk from Tokyu Oimachi Line "Kaminoge" station
○Tokyu Toyoko Line, Tokyu Oimachi Line "Jiyugaoka" station bus ride 19 minutes
It is a 5-minute walk to the back of Nippon Sport Science Univ. bus stop
■Recommended
○Possible a dog, cat breeding to two of them because of 1 dwelling unit (limit available such as the size)
○Automoatic lock
○Top floor
○Southeast Orientation
○The Southeast side has good view in a low-rise building residential area
○About 16.5 quires of LDK
○The island kitchen counter which can look around the living dining
○Bathroom with a bathroom dryer, the reheating function
○Dishwasher
○Water purifier
○Toilet bowl with warm water flush system for washing user
■November, 2025 reform completion finished
○Kitchen replaced
○Bathroom replaced
○Washstand replaced
○Restroom replaced
○Boiler replaced
○Housing part replaced
○Full-scale cross re-covering
○Boarding the floor substitute (LDK, Western-style room, corridor)
○Floor tile construction (the entrance, washing face room, restroom)
○Water supply, hot water supply, drainage, additional heating pipe replaced
○Lighting equipment setting
Read More Read Less