Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
238,000,000 JPY
Elementary school Setagaya City East Fukazawa Elementary School 830m
Junior high school Setagaya City East Fukazawa Junior High School 1,170m
Hospital Incorporated administrative agency national hospital mechanism Tokyo medical center 950m
Other facilities 1 FamilyMart Fukazawa 2 chome shop 280m
Other facilities 2 7-Eleven 5, Yakumo, Meguro store 390m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced
Interior (each room cross, floor, house cleaning) (July, 2026) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (July, 2026) plan
■Access
* A 19-minute walk from Tokyu Toyoko Line "Toritsudaigaku" station
* A 19-minute walk from Tokyu Denentoshi Line "Komazawa Daigaku" station
■Characteristics of the room
* 90.15 square meters of exclusive area, terrace 34.25 square meters
○There is a closet in each Western-style room, and storing is fulfilling
○The disposer system kitchen which can process garbage with
○The bathroom of 1620 unhurried size is with a bathroom dryer
○Renovation enforcement (going to be completed in July, 2026)
■Characteristics of the condominium
○The house environment that is full of green adjacent to Komazawa Park
○Large-scale condominium of 772 Total Units
○Because of 1 dwelling unit to two of them pets allowed (there is detailed regulations)
○Guest room and substantial common facilities (it takes some usage fee) including the theater room
○Regime + concierge service manned 24 hours a day, every day
○The home delivery box which is convenient for receiving of the baggage in the absence
○I adopt double flooring, a double ceiling
■Renovation contents (going to be completed in July, 2026)
○System kitchen newly installed
○Bathroom newly installed
○Washstand newly installed
○Restroom newly installed
○Cross each room change
○Flooring each room swap
○Boiler newly installed
○House cleaning
Read More Read Less