Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
728,000,000 JPY
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (September, 2024) plan Interior (each room cross, floor, housing part) (September, 2024) plan
■ Roppongi Hills Residence
○ Mori Building original developer
* SHIMIZU ・ Seibu Construction joint venture construction
○ 2003 April, 43-story bldg., landmark ・ Tower Residence of the Central Tokyo
○ Regime of the Front manager 24 hours Full-time Service
○ The control on vibration Structure which reduces the shaking of the earthquake
○ I access it directly on a deck to "Roppongi Hills" (about 180m)
○ Pets allowed (rules apply)
■ Renovation (going to be completed in the middle of September, 2024)
○ System kitchen replaced
○ Unit bath and toilet ・ Dresser replaced
○ Wallpaper changed ・ flooring ・ floor tile change
○ Housing part ・ entrance storing replaced
○ Boiler replaced
○ Lighting equipment New installation
■ Full common facilities
* 24 hours concierge service (bilingual-adaptive ※ fees may be charged for some services) by the Front
* It is skylounge ・ guest room (Building B ・ payment) ・ roof roof garden in Top Floor 43rd floor
* Healthy counselor's office (bilingual correspondence)
* Doorman & porter service (from 9:00 to 21:00 /B ・ Building C)
* Roppongi Hills spa juxtaposition (Building C 3F - 5F) membership system ・ examination available ・ payment
Read More Read Less