Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
278,000,000 JPY
All rooms cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced
As for the air-conditioner New setting, the lighting equipment some setting, the washing bread ・ faucet newly installed, the room cleaning, it is a (October, 2024) plan Interior (all rooms cross, floor, wall, housing part) (October, 2024) plan, Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (October, 2024) plan
■Condominium specifications
* 650 Total Units 43-story-above-the-ground large-scale Tower condominium
* Mitsubishi Corp. ・ Tokyo Tatemono Co.,Ltd. etc. original developer X Ohbayashi Corporation etc. construction
* Management (night watchman) manned for 24 hours
* There is concierge service (fees may be charged for some services)
* Pets allowed (there is detailed regulations)
* There is dust Station in each floor
* I am connected directly with Shinagawa Station in the second-floor Pedestrian deck
* Abundant common facilities
* There are clinic facilities ・ drugstores such as orthopedics ・ dermatology ・ dentistry in Tower
■Characteristics of the room
* 85.63 square meters of exclusive area, 3LDK
* The sun ・ view is good because of the 25th-floor partial Southwest Orientation dwelling unit
* Storage room
* Reform Properties
■Reform contents (going to be completed in the middle of October, 2024)
* System kitchen newly installed (with one dishwasher ・ water purifier type faucet)
* Bathroom newly installed
* Housing part newly installed
* Air-conditioner New setting (in all rooms)
* Wallpaper changed
* Flooring change
* Dresser newly installed
* Restroom newly installed
* Floor heating New setting
* Part of lighting equipment setting
* The entrance corridor Marble tension
* Boiler newly installed
* Washing bread ・ faucet newly installed
* Room cleaning
Read More Read Less