Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
388,000,000 JPY
■Indoor reform enforcement (July, 2026 construction Complete) ━━━ ...
* Kitchen replaced
* Disposer replaced
* Bathroom replaced
* Dresser replaced
* Toilet replaced
* Each room flooring swap
* Restroom flooring replaced
* Washing face powder room flooring replaced
* Each room cross replaced
* Each room housing part replaced
* Boiler replaced
* Washing Bakery replaced
* Air-conditioner replaced
* Floor heating replaced
■ Characteristics ━━━━━━━━━━ ... of the condominium
○Is built in 2008, Mitsui Fudosan Residential original developer
○30 stories above the ground, Tower condominium of 231 Total Units
○The Vibration Control Structure which adopted Shimizu hybrid Core wall
* 24-hour on-site management
* With concierge service
○Hotel-like inner corridor design
* Each floor dust Station
■It is ━━━━━━━━━━ ... about a location
○Kamiyacho, Azabudai Hills redevelopment Area close
○3 station 2 lines are available within a 10-minute walk
■Common facilities (each use restrictions, usage fee available) ━━━ ...
* Lobby lounge (the second floor)
* Club Suite (the second floor)
* Executive study room (the second floor)
* Premium lounge (the 28th floor)
Read More Read Less