Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
64,990,000 JPY
Elementary school Elementary school out of Nerima City Minamida 400m
Junior high school Nerima City Minamigaoka Junior High School 400m
Supermarket Shop out of summit store Circular Route 8 Minamida 400m
Park Park out of Minamida 450m
Hospital Nerima Hospital attached to the Juntendo University medical department 550m
Other facilities 1 7-Eleven 4, Minamitanaka, Nerima store 90m
Other facilities 2 Tsuruha drug Minamitanaka, Nerima store 450m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Door replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom) (February, 2026) plan Interior (each room cross, floor, wall, housing part, New air-conditioner one setting) (February, 2026) plan, The entrance door replaced (February, 2026) plan
■Traffic Access
○A 9-minute walk from Seibu Ikebukuro Line "Nerima-Takanodai" station
■ Recommended
○Exclusive area 61.48 square meters (about 18.59 tsubo)
○Terrace area 8.7 square meters (about 2.63 tsubo)
○8-story the second-floor partial 3LDK
○February, 2026 interior reform construction Complete finished
○Repair construction Complete finished large-scale in June, 2025
○As there is not a dwelling unit in the lower floor, the family having a small child is reliable
○Terrace facing west
・Living and the Western-style room coming and going are possible
○It is WIC in about 4.9 quires of Western-style rooms
○About 12.0 quires of LDK
○Next, there is living in about 4.9 quires of Western-style rooms
○Island kitchen counter system kitchen
○Bathroom with additional heating, the bathroom dryer
○There is automoatic lock
○There is delivery box
○New air-conditioner one setting
■ Interior reform construction contents (February, 2026 construction Complete)
○System kitchen replaced
○Bathroom replaced
○Washstand replaced
○Restroom replaced
○Wallpaper changed
○Flooring swap
○Housing part replaced
○House cleaning
Read More Read Less