Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
188,000,000 JPY
Elementary school Municipal Mitani Elementary School 430m
Junior high school Municipal Igusa Junior High School 560m
Park 区立道灌公園 160m
Other facilities 1 Lawson 1, Zenpukuji, Suginami store 640m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Boiler replaced
Interior (each room cross, floor tile washing and stretching, J, sliding paper-door replaced, ハウスク) (December, 2025) plan Exterior (outer wall) (December, 2025) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (December, 2025) plan
▼Location
・A 21-minute walk from JR Chuo Line, Sobu Kanko line "Nishiogikubo" station
・A 15-minute walk from Seibu Shinjuku Line "Kamiigusa" station
・The house environment that was quiet, and was settled down where is lined with houses
▼Recommended
・Sumitomo Forestry construction, 2009 September
・204.72 square meters over 60 tsubos in Land area
・Total floor area/183.96 square meters
・Layout /4LDK+2S
・For four parking space available (Depending on car type)
・Feeling available open at front road about 8.0m
・I arrive eastward, and exposure to the sun is good
・It is terrace available in the north and south on the roof
・About 28 tatami that 2nd floor LDK was extensive
・The space that LDK is open ceiling, and is bright
・It is counter available on the kitchen back
・Dresser, the storing of 2 bowls is abundant
・I secure six quires of all rooms or more
・It is the entrance storing and SIC available at the extensive entrance
・Restroom two possession (1st, 2nd floor)
▼Reform contents (December, 2025 enforcement)
・Cross washing and stretching, indoor some painting
・Floor tile washing and stretching
・System kitchen, ventilation fan replaced, bathroom replaced
・Dresser replaced, waterproofing bread, faucet replaced
・Restroom replaced, lighting equipment setting, Boiler replaced
・J, sliding paper-door replaced, exterior painting, house cleaning etc.
Read More Read Less