Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
27,900,000 JPY
Elementary school The municipal second elementary school 750m
Junior high school Municipal Daiichi Junior High School 890m
Park Kamiyamaya Green Space park 370m
Park Koganei Park 980m
Other facilities 1 7-Eleven MUSASHI Koganei north exit store 160m
Other facilities 2 MEGA Don Quijote Musashikoganei ekimae shop 520m
Other facilities 3 Koganei post office 100m
Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced Water Pipes replaced
Interior (floor, wall, housing part, downlight setting, switch panel replaced) (September, 2025) plan I plan intercom replaced (belonging to a recording function) working under TV monitor, fire alarm replaced (September, 2025), Place equipped with a water supply (kitchen, bathroom, restroom, washroom, water supply and drainage pipe, Boiler) (September, 2025) plan
■ Access
○An 8-minute walk from JR Chuo Main Line "Musashikoganei" station
■ Recommended
○ 2LDK of 42.52 square meters of exclusive area
○ Because of top floor the seventh floor part, lighting, the ventilation is good
○ Good 7th floor of the view
○ Pets allowed (there is detailed regulations)
○ There is an elevator
○ Repair construction enforcement finished large-scale in December, 2022
○ The distance that is flat to station
○ There is a supermarket convenience store within the range of Walk and is convenient for shopping
○ I can enjoy Walk range, seasonal nature Tokyo Koganei Municipal Park
■ Reform contents (September, 2025 Complete)
○ System kitchen replaced (faucet with water purifier)
○ Bathroom replaced (belonging to additional heating, a bathroom drying function)
○ Restroom replaced (belonging to a warm water washing function)
○ Dresser replaced
○ Water Pipes replaced
○ Boiler replaced
○ Washing waterproofing Bakery setting
○ Each room flooring swap
○ Floor tile swap (the entrance, place equipped with a water supply)
○ Cross swap (wall, the ceiling entire surface)
○ Housing part each room replaced
○ Intercom replaced (belonging to a recording function) working under TV monitor
○ Downlight setting, switch panel replaced
○ Fire alarm replaced
○ Curtain rail replaced
Read More Read Less