Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
249,800,000 JPY
Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Boiler replaced
Interior (entirely) (December, 2025) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (December, 2025) plan
■ It is ━━━━━━━━ ... about Properties
* 2 station 2 accessible lines possibilities
* Two major redevelopment of Roppongi, the Azabu is imminent Area
・ 5, Roppongi West district Category 1 city area redevelopment (going to be completed in 2030)
・ Mita Oyama-cho West district Category 1 city area redevelopment (going to be completed in 2030)
* Renovation of the UNITED ARROWS Corporation supervision
* December, 2018 iron part painting construction
* Repair construction large-scale in June, 2023
* Delivery box automoatic lock
■ It is ━━━━━━━━ ... about a room
* Southeast corner unit
* All rooms Facing South wide span dwelling unit
* About 22.3 quires of large LDK
* 77.25 square meters of 10th floor part exclusive area
* Island kitchen adoption (with a dishwasher)
* It is floor heating available in LDK
■ Reform contents (December, 2025 Complete) ━━━━━━━ ...
Flooring change, wall, ceiling wallpaper changed, housing part, the entrance storing replaced, original Dresser replaced, air-conditioner one installation, product made in TOTO washing function service opening address restroom replaced, floor heating mat setting, product made in LIXIL bathroom replaced (bathroom ventilation with clothes drying function), original system kitchen replaced (with a dishwasher), Boiler replaced (additional heating type)
Read More Read Less