Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
19,800,000 JPY
Each room cross/wall papering substitute Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced
Interior (each room cross, floor, housing part) (June, 2022) plan Place equipped with a water supply (bathroom, restroom, washroom, Boiler) (June, 2022) plan
■ The sixth-floor partial (there is no upper rank) exclusive area 61.60 square meters 2LDK ━━━━━━━━━━━━━━━ ... ・ ・
○ I arrive to Southwest, and the ・ view per positive is good
○ There is a walk-in closet
○ With bathroom ventilation drying heating machine
○ Large-scale repair construction enforcement finished (August, 2017)
○ The entrance door repair work enforcement finished (August, 2017)
■ Reform construction enforcement (June, 2022 construction) ━━━━━━━━━━━━━━━ ... ・ ・
○ Kitchen faucet replaced (with the water purifier) gas ring replaced
○ With bathroom replaced (1216 size) ventilation drying heating machine ・ Reheating function
○ Dresser replaced
○ Washing Bakery replaced
○ One Washlet type restroom replaced
○ Flooring change (LDK ・ Western-style room)
○ Stone tile change (the entrance)
○ Floor tile change (washing face ・ restroom)
○ All the housing parts replaced
○ Boiler replaced
○ A feeling of person sensor ・ lighting equipment setting
○ NanoE generator setting
○ Downlight setting with the Bluetooth speaker
○ Air-conditioner setting (precedent Water Pipes)
○ Intercom replaced with the TV monitor
○ Screen door change
○ Lower tentative marriage replaced
○ Lighting equipment setting
○ Curtain rail ・ lace curtain replaced
○ House cleaning
Read More Read Less