Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
21,900,000 JPY
Elementary school Chiba City Saiwaicho third elementary school 380m
Junior high school Chiba City Saiwaicho second junior high school 540m
Supermarket Kasumi food Square Chibaminato store 870m
Park Garden out of Saiwaicho 240m
Hospital Yamazaki internal medicine 800m
Other facilities 1 Matsumotokiyoshi Chiba-Minato Station store 600m
Other facilities 2 Lawson Saiwaicho, Chiba store 420m
Other facilities 3 Chiba garden Town post office 650m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced Water Pipes replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom, water supply and drainage pipe, Boiler, washing bread) (May, 2025) plan Shoes box New setting (May, 2025) plan, Interior (each room cross, floor, housing part) (May, 2025) plan
■ Sales point
○ It is the BIC community of 1,414 Total Units with all six
○ The fourth-floor partial Southwest Orientation of 12 stories
○ May, 2025 reform Complete
○ Pets allowed (separately breeding rules apply)
○ The condominium site is in a tennis court or the park at the large site that is full of green.
○ Warehouse (storage room) one possession exclusive on condominium the first floor
■ Reform contents (May, 2025 reform Complete)
○ System kitchen newly installed
○ Dresser newly installed
○ Restroom (toilet, tank) replaced
○ Bathroom newly installed (with ※ bathroom dryer)
○ Boiler newly installed
○ Service pipe, hot water supply pipe replaced
○ Washing waterproofing Bakery replaced
○ Housing part replaced
○ Flooring change (LDK, corridor, Western-style room)
○ Cross each room change (wall, ceiling)
○ Cushion floor change (washing face room, restroom)
○ Shoes box New setting
○ Base board replaced
○ Tree part, the iron part painting
○ Lighting newly installed (each room, downlight)
○ Precedent Water Pipes for the AC
○ House cleaning
Read More Read Less