Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
33,800,000 JPY
Elementary school Narashino City Tsudanuma elementary school 290m
Junior high school The Narashino City fifth junior high school 1,400m
Hospital Tsudanuma Chuo general hospital 870m
Other facilities 1 7-Eleven Tsudanuma store 360m
Other facilities 2 Drugstore Matsumotokiyoshi Tanitsu shop 870m
Other facilities 3 Narashino-shi government office 830m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom) (July, 2026) plan Interior (each room cross) (July, 2026) plan As for the lights with LED light all rooms New installation, housing part (door, sliding door) newly installed, feeling of person from entrance sensor, it is a (July, 2026) plan
-Recommended - of the Properties
▼Location
・An 8-minute walk from Keisei Main Line "Keiseitsudanuma" station
・ A 17-minute walk from Sobu Main Line, JR Chūō,Sōbu Line (Local) "Tsudanuma" station
▼Characteristics of the condominium
・3LDK of 72.39 square meters of exclusive area
・3rd floor part of the Reinforced Concrete 6-story bldg.
・The Southwest side terrace
▼Characteristics of the room
・There is a feeling of opening in about 16.7 quires of LDK
・Island kitchen counter
・All rooms with flooring
・Light at the entrance with feeling of person sensor
・Toilet bowl with warm water flush system for washing user restroom with
・System kitchen with tableware washing machine, one faucet type water purifier
▼Reform contents (going to be completed in July, 2026)
・System bus system kitchen, Dresser replaced
・Shoes box restroom, waterproofing Bakery replaced
・All rooms wallpaper changed, all rooms and corridor flooring change
・Washing face and restroom floor tile swap, housing part (door, sliding door) replaced
・LED light all rooms New installation (ceiling Right)
・Light at the entrance with feeling of person sensor, toilet bowl with warm water flush system for washing user restroom setting belonging to
・Each room house cleaning
■We help you find a property that meets your needs
For property details or inquiries, please feel free to contact us.
Read More Read Less