Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
70,990,000 JPY
Elementary school Kawasaki City Sakado elementary school 290m
Junior high school Kawasaki City Takatsu Junior High School 440m
Supermarket Maruetsu Kawasaki Sakado store 290m
Park Hisamoto 3 chome はなのき park 220m
Hospital The Mizonokuchi stomach and intestines department, internal medicine clinic 200m
Other facilities 1 7-Eleven Kawasaki Futago 6 chome shop 420m
Other facilities 2 Create SD Kawasaki Takatsu shop 510m
Other facilities 3 Don Quijote Mizonokuchi ekimae shop 790m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Door replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom) (July, 2026) plan Interior (each room cross, floor, housing part, air-conditioner) (July, 2026) plan
■ Access
○ A 12-minute walk from Tokyu Denentoshi Line, Oimachi Line "Takatsu" station
○ A 13-minute walk from JR Nambu Line "Musashimizonokuchi" station
○ A 14-minute walk from Tokyu Denentoshi Line, Oimachi Line "Mizonokuchi" station
■ Recommended ━━━━━━━━━━━ ...
○ The location that is available for the use of 3 lines
○ The sun, the ventilation is good about each room two lighting
○ Island kitchen counter to be able to enjoy a conversation during cooking
○ With the floor heating warming from the step (living part)
○ Two terrace of the Southeast Orientation
○ The delivery box which can get baggage in the absence
○ There is Parking lot of the with exclusive usage rights (for free)
■ Facilities, specifications ━━━━━━━━━━━━━━ ...
○ Automoatic lock
○ Each room flooring
○ Air-conditioner, floor heating
○ Tableware washing machine
○ Bathroom ventilation with clothes drying function, reheating function
○ Toilet bowl with warm water flush system for washing user
■ Reform contents ━━━━━━━━━━━━ ...
<going to be completed in July, 2026>
○ Each room cross flooring swap
○ Floor tile swap
○ Housing part, kitchen, bathroom, washing face, restroom newly installed
○ Air-conditioner New setting
Read More Read Less