Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
57,800,000 JPY
Elementary school Kamakura City Nishikamakura elementary school 600m
Junior high school Kamakura City Tebiro junior high school 950m
Supermarket Sea bass shop Nishikamakura store 1,000m
Other facilities 1 Lawson 2, Nishikamakura store 750m
Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom) (October, 2013) plan Exterior (outer wall) (February, 2017) plan It is Low-E newly installed (around June, 2018 enforcement) terrace setting (around July, 2019 enforcement) (June, 2018) plan in change (around March, 2017 enforcement) floor heating, insulation construction, the windowpane of the 1st Western-style room 2nd floor Japanese-style room from a 1st Japanese-style room to a Western-style room
-Recommended - of the Properties
▼Characteristics of the room
・ Living and the adjacent Western-style room (about 7.0 quires) adopt a slide door
・ The living that bright sunlight comes in
・ Japanese-style room of the calm atmosphere
▼Facilities
・ Bathroom, the washroom which there is a window, and is easy to ventilate it, and is bright
・ 1.2 floor with toilet
・ There is the storeroom, floor lower storing, too and is rich in storing
・ The sun, the ventilation is good because of both sides terrace
・ The warm Wood deck which can spend time leisurely
▼Reform contents
[newly installed]
・Bathroom, 1st washroom (around October, 2013)
・2nd floor restroom, 2nd floor washroom (around December, 2015)
・1st Western-style room, windowpane Low-E replaced (around June, 2018) of the 2nd floor Japanese-style room
・Kitchen (around August, 2019)
[Other]
・Exterior painting (around February, 2017)
・Floor heating, insulation construction (around June, 2018)
・2nd floor terrace setting (around July, 2019)
■ We help you find a property that meets your needs ━━━━ ...
For property details or inquiries, please feel free to contact us.
Read More Read Less