Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
299,990,000 JPY
Each room cross/wall papering substitute Bathroom replaced Restroom replaced Dresser replaced Floor replaced Door replaced
Interior (each room cross, floor, housing part) (February, 2026) plan Place equipped with a water supply (bathroom, restroom, washroom) (February, 2026) plan
■ THE CENTER TOKYO ━━━━ ...
○ Mitsui Fudosan Co.,Ltd., Nomura Real Estate Development, Mitsubishi Estate Co.,Ltd. original developer
○ Ohbayashi Corporation old construction
○ Hotel-like inner corridor design
○ Satisfying common use part
(guest room, kitchen studio, kids' room, lounge, fitness & sauna)
■ Specifications ━━━━━━━━━━━━━━━━━ ...
○ Double flooring, double ceiling
○ Clearing out of space for the pet
○ The 24-hour on-site management system
○ Triple certification security
■ Characteristics ━━━━━━━━━━━━━ ... of the dwelling unit
○ Because of a 38-story bldg. 30th floor part, the sunshine, a view is good
○ 92.29 square meters, 3LDK
○ Walk-in closet available
○ About 2.9 quires of shoe closet available
○ Bathroom of 1620 size
○ There is floor heating (LD part)
○ February, 2026 reform Complete
・Dishwasher, kitchen replaced with the water purifier
・Range hood replaced
・Washstand replaced
・Waterproofing Bakery replaced
・Bathroom replaced (thermal insulation bathtub)
・Restroom replaced
・Wall, ceiling wallpaper changed
・Flooring change
・Washing face alcove of a tea arbor change
・Restroom floor change
・Housing part replaced
・Ceiling cassette air conditioner replaced
・Floor heating replaced
Read More Read Less