Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
128,000,000 JPY
Elementary school Kita-9-jo Elementary School 450m
Junior high school The polestar junior high school 1,350m
Park Satsuki Park 420m
Hospital 斗南病院 1,020m
Other facilities 1 JR Hakodate Main Line Sapporo Station 190m
Other facilities 2 Subway Toho Line, Namboku Line "Sapporo" station Exit 15 200m
Other facilities 3 Satudora Kita-8-jo store 810m
Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Boiler replaced
Interior (entirely) (February, 2026) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler) (February, 2026) plan
■8.3 Square D Grafort Sapporo Station Tower
○February, 2026 reform Complete
○A 3-minute walk from subway Namboku Line "Sapporo" station
○A 3-minute walk from subway Toho Line "Sapporo" station
○A 3-minute walk from JR Hakodate Main Line "Sapporo" station
○I am connected directly to the Sapporo Station underground passage
○3LDK of 40-story-above-the-ground the 34th-floor part
○Because of Southeast Orientation corner unit, exposure to the sun is good
○Triple security
○Trash collection area 24H available ability (I install it in each floor)
○Dishwasher, disposer kitchen with
○On the dwelling unit entrance side storage room (for free)
○Pets allowed (terms available)
○All electrification
○All rooms with flooring
○All rooms storing available
○Delivery box available
○Intercom with color TV monitor
○To Kita-9-jo Elementary School about 450m (a 6-minute walk)
■Reform contents (February, 2026 Complete)
○System kitchen replaced (with a dishwasher)
○Bathroom replaced (with a bathroom heating dryer)
○Each room cross replacement
○Flooring washing and stretching
○Floor tile replaced (entrance, restroom, washing face room)
○Dresser, waterproofing Bakery replaced
○Restroom replaced (toilet bowl with warm water flush system for washing user restroom with)
○Lighting equipment, housing part replaced etc.
Read More Read Less