Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
22,800,000 JPY
Elementary school Komaki City Komaki Elementary School 1,320m
Junior high school Komaki City Komaki Junior High School 400m
Supermarket MEGA Don Quijote UNY Komaki shop 300m
Other facilities 1 Lawson 3, Motomachi, Komaki store 900m
Other facilities 2 V ・ drug Horinouchi shop 230m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Boiler replaced Door replaced
Interior (I change an each room cross, a floor, a housing part, the Japanese-style room to the Western-style room switchboard, entrance storing, キッ) (January, 2025) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom, Boiler, water supply ・ hot water supply ・ additional heating pipe new Water Pipes, washing bread ・) (January, 2025) plan
■ Recommended ━━━━━━━━━━━━━━━ ... ・ ・
○ I arrive so that Southwest Corner Unit has it, and an authority of sun ・ style is good
○ Extensive space of LDK about 16.7 quires
○ The island kitchen counter system kitchen which enjoys the talks with the family
○ There is all rooms storing
○ There is an exclusive garden
■ January, 2025 Renovation completed ━━━━━━━━━━━━━━━ ... ・ ・
○ System kitchen replaced (with a dishwasher)
○ I change it for bathroom 1416 (with the bath warmth)
○ Shower toilet replaced
○ Dresser replaced
○ Additional heating-type Boiler replaced
○ Water supply ・ hot water supply ・ additional heating pipe new Water Pipes
○ Faucet replaced for the washing Bakery ・ washing
○ Each room cross swap
○ Flooring swap (LD ・ Western-style room ・ corridor)
○ CF swap (kitchen ・ washing face room ・ restroom)
○ Housing part replaced
○ I change the Japanese-style room to the Western-style room
○ Switchboard replaced
○ The entrance storing replaced
○ The kitchen counter fixtures
○ New curtain rail installation
○ Switch ・ outlet exchange
○ Screen door swap
○ The sash painting
○ LD air-conditioner installation
○ House cleaning
Read More Read Less