Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
284,800,000 JPY
Supermarket Summit store Daikanyama Hachiyama-cho store 200m
Other facilities 1 Lawson Nanpeidai store 240m
Other facilities 2 7-Eleven Nanpeidaicho, Shibuya store 310m
Other facilities 3 Sakuragaoka, Shibuya post office 600m
Restroom replaced Floor replaced Boiler replaced Door replaced
Place equipped with a water supply (restroom, Boiler) (August, 2025) plan Interior (floor, housing part) (August, 2025) plan
■ Access
* A 10-minute walk from Keio Inokashira Line "Shibuya" station
* A 11-minute walk from JR Yamanote Line "Shibuya" station
* Tokyu Denentoshi Line, Toyoko Line, a 13-minute walk from Tokyo Metro Hanzomon Line, Fukutoshin Line "Shibuya" station
* A 14-minute walk from Tokyu Toyoko Line "Daikanyama" station
■Park House Nanpeidai Court Residence
* Mitsubishi Estate Co., Ltd. sale in lots X TOKYU CONSTRUCTION construction
* Graceful Yashikicho Nanpeidai-cho that I received for one step from dirt and noise of the city of Shibuya
* Privacy-related high design of all dwelling unit corner unit
* Good regime by the Mitsubishi Jisho Community Co., Ltd.
* 24 hours security system
■ Point of the room
* 80.31 square meters of 2LDK types
* Southeast, Southwest corner unit
* Two terrace living side terrace is about 2m in depth
* There is a window in a bathroom of 1620 size
* There is disposer built-in Dishwasher and dryer, built-in electron convec in the kitchen
* Storage room with exclusive usage rights (separately usage fee available)
■ Reform contents (August, 2025 completion)
* Boiler replaced
* Part of kitchen replaced
・Faucet, range hood cooker convec, dishwasher replaced
* Part of bathroom replaced
・Shower, mirror, faucet, bathtub, hanger pipe cover replaced
* Washing machine replaced
* Bathroom ventilation drying heating machine replaced
* Restroom replaced
* Ventilation fan replaced
* Air-conditioner (aerotech) body replaced
* Floor heating panel replaced (LD part)
* Lighting equipment replaced (downlight ceiling Right)
* Flooring, polyvinyl chloride tile, earthen floor tile change
* Wallpaper changed
* Curtain rail replaced
* Switch panel outlet plate replaced
Read More Read Less