Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
30,980,000 JPY
Elementary school Hood South elementary school 190m
Junior high school Kashiwa junior high school 390m
Park Nakanoshima tile park 890m
Hospital Sapporo IBD clinic 370m
Other facilities 1 Satudora South Article 22 shop 650m
Other facilities 2 7-Eleven Sapporo South high school prev shop 150m
Other facilities 3 Authority of mountain nose East colonial soldier-settlement post office 560m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Door replaced
Interior (each room cross, floor, housing part) (March, 2026) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom) (March, 2026) plan, Living heating machine replaced, all screen door point swap, switchboard newly installed, switch outlet plate replaced, curtain rail replaced (March, 2026) plan
-Recommended - of the Properties
▼Location
○About 2-minute walk from Sapporo streetcar "mountain nose Article 19" station
○About 12-minute walk from subway Namboku Line "Horohirabashi" station
▼Characteristics of the condominium
○Nomura Real Estate Development original developer
○1986 June
○Large-scale condominium of 122 Total Units
○Safe regime of the manager Daytime Only
○Pets allowed (there is the limit by terms)
○There is storage room (free use for the whole family)
▼Characteristics of the room
○3LDK of the top floor corner unit
○Exclusive area: 90.21 square meters
○A terrace area: 10.97 square meters
○It is gets plenty of sunlight because of Facing South
○There is all rooms storing
○There is the south side terrace
▼Reform contents (March, 2026 Complete)
○System kitchen newly installed
○Bathroom newly installed
○Washing face room newly installed
○Restroom newly installed
○Cross each room swap
○Flooring each room swap
○All the housing parts newly installed
○Electric water heater newly installed
○Living heating machine newly installed
○All screen door point swap
○Switchboard newly installed
○Switch outlet plate replaced
○Curtain rail replaced
■ We help you find a property that meets your needs
For property details or inquiries, please feel free to contact us.
Read More Read Less