Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
36,900,000 JPY
Elementary school Sapporo City Misono elementary school 620m
Junior high school Article 8 junior high school 130m
Park Misono prospers; a park 270m
Hospital The department of internal medicine which minds Misono 460m
Other facilities 1 Subway Toho Line "Toyohirakoen" station 110m
Other facilities 2 Satudora Misono, Toyohira store 380m
Other facilities 3 Lawson Misono, Sapporo Article 8 shop 60m
Each room cross/wall papering substitute Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Door replaced Water Pipes replaced
Interior (each room cross, floor, wall, housing part, house cleaning) (January, 2026) plan Place equipped with a water supply (kitchen, bathroom, restroom, washroom, water supply and drainage pipe) (January, 2026) plan
■Overview
○A 2-minute walk from subway Toho Line "Toyohirakoen" station
○Reinforced Concrete 10 stories above the ground the ninth floor part
○1996 (Heisei 8) March
○76.69 square meters of exclusive area (about 23.19 tsubo)
○Terrace 9.36 square meters in area (about 2.83 tsubo)
○3LDK
○City gas
○Storage room available (available in ※ free)
■Recommended points
○Automoatic lock available
○Delivery box available
○It is gets plenty of sunlight because of the Southwest side terrace
○Island kitchen counter system kitchen (with the tableware washing dryer)
○It is storing available in all rooms
○It is one elevator to three houses
○To Misono Elementary School an 8-minute walk (about 620m)
○To an Article 8 junior high school a 2-minute walk (about 130m)
○To a Lawson Misono, Sapporo Article 8 shop a 1-minute walk (about 60m)
■Reform contents (January, 2026 Complete)
○System kitchen newly installed
○Bathroom newly installed
○Dresser newly installed
○Restroom newly installed
○Housing part newly installed
○Water Pipes update
○Tableware washing dryer newly installed
○Cross entire surface change
○House cleaning etc.
Read More Read Less