Our Site uses cookies to improve your experience on our website. For more details, please read Cookie Policy.
By closing this message or starting to navigate on this website, you agree to our use of cookies.
This page is translated using machine translation. Please note that the content may not be 100% accurate.
Glossary
27,900,000 JPY
Elementary school Label seedling Midori Elementary School 1,230m
Junior high school Label seedling North junior high school 1,750m
Supermarket The ビッグエクスプレスモエレ shop 970m
Park East Naebo rainbow park 40m
Hospital さの internal medicine circulatory organ clinic 850m
Other facilities 1 Tsuruha drug East Naebo store 1,240m
Other facilities 2 FamilyMart Higashinaebo-14-jo, Sapporo store 530m
Other facilities 3 Seicomart Higashinaebo-13-jo store 750m
Kitchen replaced Bathroom replaced Restroom replaced Dresser replaced Floor replaced Door replaced Water Pipes replaced
Place equipped with a water supply (kitchen, bathroom, restroom, washroom, water supply and drainage pipe) (February, 2025) plan Interior (floor, wall, housing part) (February, 2025) plan
◆ 1, Higashinaebo-14-jo Detached House
○ February, 2025 interior reform Complete
○ Subway Toho Line "Kanjodorihigashi" station bus ride 26 minutes
HOKKAIDO CHUO BUS "3, Higashinaebo-14-jo" 停徒歩 eight minutes
* 208.96 square meters of plottage (about 63.21 tsubo)
* 108.47 square meters of total floor area (about 32.81 tsubo)
62.10 square meters of 1st, 2nd floor 46.37 square meters
* For two parking space (Depending on car type)
* LDK about 17.5 quires
* There is storing in each room
* There is a restroom in 1, 2nd floor
◆ The reform contents (February, 2025 Complete) mentioned above
○ System kitchen replaced
○ Bathroom replaced (with the reheating function)
○ Dresser replaced
○ Restroom replaced (one Washlet type)
○ Cushion floor swap
○ Floor swap (LDK, Western-style room, hall)
○ Wallpaper changed (each room)
* Some housing parts replaced
* Lower tentative marriage new establishment
* Intercom new establishment with the monitor
* Insulation entrance door setting
* Lighting equipment setting
* Boiler replaced
* All water supply hot water supply Water Pipes replaced etc.
Read More Read Less